GK Developers LimitedYour Vision, Our Build

Project case study

Petts Wood, London

In progress

Rear dormer loft conversion, full roof replacement & whole-house refurbishment

At Petts Wood, London, a rear dormer is creating a new loft floor as part of a full roof replacement and whole-house refurbishment. Structural steelwork and temporary works are being coordinated with the roof sequence and changes to the internal layout.

Call
Exposed loft floor framing above existing brickwork

What the project involved

The wider scope includes a full strip-out and replastering, new wiring, plumbing and heating, drainage alterations and repairs, plus an alarm and CCTV. The gallery shows work in progress, including the new loft floor structure.

  • Rear dormer loft conversion and full roof replacement
  • Structural steelwork and internal layout alterations
  • Coordinated temporary works and roof sequencing
  • Whole-house strip-out, plasterboarding and plastering
  • New wiring, plumbing and heating
  • Drainage alterations and repairs, alarm and CCTV

Tell us what you are planning.

Discuss a loft conversion →

Full project enquiry

Your project

Project details

All locations are welcome to enquire. We will confirm coverage.

Contact details

Please provide a phone number or email so we can reply.

Your enquiry will be sent through our form provider and forwarded to enquiries@gkdevelopers.co.uk. It is used to discuss your project. Privacy policy ·

This includes the campaign fields listed in our privacy information. You can enquire without this optional tracking.

Review your enquiry

You can also contact us directly: Call · WhatsApp · enquiries@gkdevelopers.co.uk

Enquiry privacy

GK Developers Limited uses the information you submit to review and respond to your project enquiry. Submission sends your details to our configured form provider for processing and onward email delivery to enquiries@gkdevelopers.co.uk. This site confirms receipt only when that provider accepts the request.

Form provider: Formspree. We keep enquiry details only as long as needed to respond and handle any follow-up. Only Deluxson and Jana have access to the enquiries inbox.

Optional attribution records only utm_source, utm_medium, utm_campaign, utm_term, gclid, the referring page and landing page. After you opt in, these fields are stored in sessionStorage for this browser session and included in your enquiry. Other query parameters and URL fragments are removed. Your contact details are not stored in sessionStorage.

Optional cookieless analytics can count page visits and the four enquiry events. They are disabled until configured. The hooks send event names and page paths, without form answers, campaign values or contact details.

Read our privacy policy or email enquiries@gkdevelopers.co.uk. Calling, emailing or opening WhatsApp uses the service you choose under its own terms.